
- Rio Tinto Group (RIO)’s unit, Rio Tinto Logistics, won a maximum $995M IDIQ contract on Friday for high-purity aluminum.
- The five-year contract has no option periods and runs through May 7, 2031.
- The contract is funded with fiscal 2025–2029 transaction funds